R8.S1.01-0 | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 23 | ----- | 0 | ----- | 0 |
R8.S1.01-0 | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 32.3 | ----- | 0 | ----- | 0 |
R8.S1.01-0 | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 565.34 | ----- | 0 | ----- | 0 |
R8.S1.01-0 | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 33.46 | ----- | 0 | ----- | 0 |
R8.S1.01-0 | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 36.36 | ----- | 0 | ----- | 0 |
R8.S1.01-0 | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 563.55 | ----- | 0 | ----- | 0 |
R8.S1.01-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 40 | ----- | 0 |
R8.S1.01-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 35 | ----- | 0 |
R8.S1.01-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 200 | ----- | 0 |
R8.S1.01-0 | 2 | Cross Section Location | Representative | | 0 | Number | 0 | ----- | 0 |
R8.S1.01-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
R8.S1.01-0 | 2 | Encroachment | Road | One Side | 185.63 | Height | 5 | ----- | 0 |
R8.S1.01-0 | 2 | Encroachment | Road | One Side | 551.01 | Height | 25 | ----- | 0 |
R8.S1.01-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
R8.S1.01-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
R8.S1.01-0 | 2 | Stormwater Input | Urban Stormwater Pipe | | 0 | ----- | 0 | ----- | 0 |
R8.S1.01-0 | 2 | Straightening | Straightening | | 152.21 | ----- | 0 | ----- | 0 |
R8.S1.01-0 | 2 | Straightening | Straightening | | 190.82 | ----- | 0 | ----- | 0 |
R8.S1.01-0 | 2 | Straightening | Straightening | | 595.15 | ----- | 0 | ----- | 0 |
R8.S1.05-A | 2 | Bridge or Culvert | Culvert | | 0 | Length | 40 | ----- | 0 |
R8.S1.05-A | 2 | Buffers Less than 25 feet | | Left Bank | 81.42 | ----- | 0 | ----- | 0 |
R8.S1.05-A | 2 | Buffers Less than 25 feet | | Left Bank | 90.53 | ----- | 0 | ----- | 0 |
R8.S1.05-A | 2 | Buffers Less than 25 feet | | Right Bank | 64.39 | ----- | 0 | ----- | 0 |
R8.S1.05-A | 2 | Cross Section Location | Representative | | 0 | Number | 0 | ----- | 0 |
R8.S1.05-A | 2 | Development | | Both Sides | 180.19 | ----- | 0 | ----- | 0 |
R8.S1.05-A | 2 | Grade Control | Ledge | Picture | 0 | Height | 4 | HtAbvWater | 3 |
R8.S1.05-A | 2 | Grade Control | Ledge | Picture | 0 | Height | 6 | HtAbvWater | 6 |
R8.S1.05-A | 2 | Grade Control | Waterfall | Picture | 0 | Height | 16 | HtAbvWater | 16 |
R8.S1.05-A | 2 | Mass Failure | | Right Bank | 19.78 | Height | 7 | ----- | 0 |
R8.S1.05-A | 2 | Migration | Avulsion | | 0 | ----- | 0 | ----- | 0 |
R8.S2.02-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 340 | ----- | 0 |
R8.S2.02-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 70 | ----- | 0 |
R8.S2.02-0 | 2 | Encroachment | Improved Path | One Side | 188.31 | Height | 10 | ----- | 0 |
R8.S2.02-0 | 2 | Mass Failure | | Left Bank | 37.91 | Height | 15 | ----- | 0 |
R8.S2.02-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
R8.S2.02-0 | 2 | Straightening | Straightening | | 120.29 | ----- | 0 | ----- | 0 |
R8.S2.02-0 | 2 | Straightening | Straightening | | 343.28 | ----- | 0 | ----- | 0 |