T01-0 | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 24.16 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 34.82 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 18.17 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 47.89 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 16.39 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 18.7 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 39.75 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 47.15 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 150.04 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 84.44 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 93.2 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 241.66 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 246.81 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 305.55 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 340.54 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 100 | ----- | 0 |
T01-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 200 | ----- | 0 |
T01-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 300 | ----- | 0 |
T01-0 | 2 | Buffers Less than 25 feet | | Right Bank | 203.27 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Buffers Less than 25 feet | | Right Bank | 412.9 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Buffers Less than 25 feet | | Right Bank | 546.93 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T01-0 | 2 | Development | | Both Sides | 43.58 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Development | | Both Sides | 46.86 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Development | | One Side | 319.44 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Dredging | Gravel Mining | General Location | 0 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Encroachment | Road | Both Sides | 556.74 | Height | 0 | ----- | 0 |
T01-0 | 2 | Encroachment | Road | One Side | 284.79 | Height | 0 | ----- | 0 |
T01-0 | 2 | Erosion | | Left Bank | 62.68 | Height | 6 | ----- | 0 |
T01-0 | 2 | Erosion | | Left Bank | 91.19 | Height | 3 | ----- | 0 |
T01-0 | 2 | Erosion | | Left Bank | 153.52 | Height | 3 | ----- | 0 |
T01-0 | 2 | Erosion | | Left Bank | 206.5 | Height | 3 | ----- | 0 |
T01-0 | 2 | Erosion | | Left Bank | 244.22 | Height | 4 | ----- | 0 |
T01-0 | 2 | Erosion | | Left Bank | 344.49 | Height | 3 | ----- | 0 |
T01-0 | 2 | Erosion | | Right Bank | 70 | Height | 3 | ----- | 0 |
T01-0 | 2 | Erosion | | Right Bank | 73.23 | Height | 4 | ----- | 0 |
T01-0 | 2 | Erosion | | Right Bank | 95.67 | Height | 5 | ----- | 0 |
T01-0 | 2 | Erosion | | Right Bank | 141.09 | Height | 4 | ----- | 0 |
T01-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 4 | HtAbvWater | 3 |
T01-0 | 2 | Mass Failure | | Left Bank | 88 | Height | 30 | ----- | 0 |
T01-0 | 2 | Migration | Avulsion | | 0 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T01-0 | 2 | Straightening | Straightening | | 452.23 | ----- | 0 | ----- | 0 |
T02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 101.18 | ----- | 0 | ----- | 0 |
T02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 66.11 | ----- | 0 | ----- | 0 |
T02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 147.17 | ----- | 0 | ----- | 0 |
T02-0 | 2 | Buffers Less than 25 feet | | Left Bank | 86.56 | ----- | 0 | ----- | 0 |
T02-0 | 2 | Buffers Less than 25 feet | | Left Bank | 485.29 | ----- | 0 | ----- | 0 |
T02-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T02-0 | 2 | Erosion | | Left Bank | 112.86 | Height | 3 | ----- | 0 |
T02-0 | 2 | Erosion | | Right Bank | 62.14 | Height | 6 | ----- | 0 |
T02-0 | 2 | Erosion | | Right Bank | 113.82 | Height | 4 | ----- | 0 |
T02-0 | 2 | Erosion | | Right Bank | 118.89 | Height | 6 | ----- | 0 |
T02-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T02-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T03-0 | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 32.4 | ----- | 0 | ----- | 0 |
T03-0 | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 30.84 | ----- | 0 | ----- | 0 |
T03-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 22.93 | ----- | 0 | ----- | 0 |
T03-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 32.99 | ----- | 0 | ----- | 0 |
T03-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 23.67 | ----- | 0 | ----- | 0 |
T03-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 25.43 | ----- | 0 | ----- | 0 |
T03-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 135 | ----- | 0 |
T03-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T03-0 | 2 | Development | | Both Sides | 57.02 | ----- | 0 | ----- | 0 |
T03-0 | 2 | Erosion | | Left Bank | 247.07 | Height | 4 | ----- | 0 |
T03-0 | 2 | Erosion | | Right Bank | 74.88 | Height | 3 | ----- | 0 |
T03-0 | 2 | Erosion | | Right Bank | 75 | Height | 5 | ----- | 0 |
T03-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T03-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T03-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T03-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T03-0 | 2 | Straightening | Straightening | | 579.9 | ----- | 0 | ----- | 0 |
T04-0 | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 62.03 | ----- | 0 | ----- | 0 |
T04-0 | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 56.43 | ----- | 0 | ----- | 0 |
T04-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 62.32 | ----- | 0 | ----- | 0 |
T04-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 281.47 | ----- | 0 | ----- | 0 |
T04-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 150 | ----- | 0 |
T04-0 | 2 | Buffers Less than 25 feet | | Left Bank | 232.02 | ----- | 0 | ----- | 0 |
T04-0 | 2 | Buffers Less than 25 feet | | Left Bank | 279.51 | ----- | 0 | ----- | 0 |
T04-0 | 2 | Buffers Less than 25 feet | | Left Bank | 285.43 | ----- | 0 | ----- | 0 |
T04-0 | 2 | Buffers Less than 25 feet | | Right Bank | 1197.66 | ----- | 0 | ----- | 0 |
T04-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T04-0 | 2 | Development | | Both Sides | 46.61 | ----- | 0 | ----- | 0 |
T04-0 | 2 | Encroachment | Berm | One Side | 169.1 | Height | 7 | ----- | 0 |
T04-0 | 2 | Encroachment | Road | One Side | 928.94 | Height | 0 | ----- | 0 |
T04-0 | 2 | Erosion | | Left Bank | 88.3 | Height | 6 | ----- | 0 |
T04-0 | 2 | Erosion | | Left Bank | 233.3 | Height | 8 | ----- | 0 |
T04-0 | 2 | Erosion | | Left Bank | 267.18 | Height | 4 | ----- | 0 |
T04-0 | 2 | Erosion | | Left Bank | 300.84 | Height | 4 | ----- | 0 |
T04-0 | 2 | Erosion | | Right Bank | 89.49 | Height | 4 | ----- | 0 |
T04-0 | 2 | Erosion | | Right Bank | 121.71 | Height | 3 | ----- | 0 |
T04-0 | 2 | Erosion | | Right Bank | 133.2 | Height | 4 | ----- | 0 |
T04-0 | 2 | Erosion | | Right Bank | 169.66 | Height | 7 | ----- | 0 |
T04-0 | 2 | Erosion | | Right Bank | 190.94 | Height | 4 | ----- | 0 |
T04-0 | 2 | Erosion | | Right Bank | 195.31 | Height | 4 | ----- | 0 |
T04-0 | 2 | Erosion | | Right Bank | 198.28 | Height | 4 | ----- | 0 |
T04-0 | 2 | Erosion | | Right Bank | 240.92 | Height | 7 | ----- | 0 |
T04-0 | 2 | Mass Failure | | Right Bank | 41.17 | Height | 15 | ----- | 0 |
T04-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T04-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T04-0 | 2 | Straightening | Straightening | | 300.81 | ----- | 0 | ----- | 0 |
T05-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 56.35 | ----- | 0 | ----- | 0 |
T05-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 217.19 | ----- | 0 | ----- | 0 |
T05-0 | 2 | Buffers Less than 25 feet | | Right Bank | 702.48 | ----- | 0 | ----- | 0 |
T05-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T05-0 | 2 | Dredging | Gravel Mining | General Location | 0 | ----- | 0 | ----- | 0 |
T05-0 | 2 | Encroachment | Road | One Side | 696.57 | Height | 8 | ----- | 0 |
T05-0 | 2 | Encroachment | Road | One Side | 1530.44 | Height | 8 | ----- | 0 |
T05-0 | 2 | Erosion | | Left Bank | 46.47 | Height | 5 | ----- | 0 |
T05-0 | 2 | Erosion | | Left Bank | 53.88 | Height | 6 | ----- | 0 |
T05-0 | 2 | Erosion | | Left Bank | 59.47 | Height | 3 | ----- | 0 |
T05-0 | 2 | Erosion | | Left Bank | 84.31 | Height | 3 | ----- | 0 |
T05-0 | 2 | Erosion | | Left Bank | 118.79 | Height | 5 | ----- | 0 |
T05-0 | 2 | Erosion | | Left Bank | 242.73 | Height | 6 | ----- | 0 |
T05-0 | 2 | Erosion | | Left Bank | 281.9 | Height | 4 | ----- | 0 |
T05-0 | 2 | Erosion | | Right Bank | 50.49 | Height | 3 | ----- | 0 |
T05-0 | 2 | Erosion | | Right Bank | 188.19 | Height | 6 | ----- | 0 |
T05-0 | 2 | Erosion | | Right Bank | 206.99 | Height | 5 | ----- | 0 |
T05-0 | 2 | Migration | Avulsion | | 0 | ----- | 0 | ----- | 0 |
T05-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T05-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T05-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T05-0 | 2 | Straightening | Straightening | | 369.97 | ----- | 0 | ----- | 0 |
T06-0 | 2 | Buffers Less than 25 feet | | Right Bank | 46.32 | ----- | 0 | ----- | 0 |
T06-0 | 2 | Buffers Less than 25 feet | | Right Bank | 204.42 | ----- | 0 | ----- | 0 |
T06-0 | 2 | Buffers Less than 25 feet | | Right Bank | 260.11 | ----- | 0 | ----- | 0 |
T06-0 | 2 | Buffers Less than 25 feet | | Right Bank | 347.26 | ----- | 0 | ----- | 0 |
T06-0 | 2 | Cross Section Location | Representative | | 0 | Number | 0 | ----- | 0 |
T06-0 | 2 | Development | | One Side | 139.5 | ----- | 0 | ----- | 0 |
T06-0 | 2 | Development | | One Side | 187.42 | ----- | 0 | ----- | 0 |
T06-0 | 2 | Development | | One Side | 222.04 | ----- | 0 | ----- | 0 |
T06-0 | 2 | Dredging | Gravel Mining | General Location | 0 | ----- | 0 | ----- | 0 |
T06-0 | 2 | Encroachment | Road | One Side | 2775.75 | Height | 12 | ----- | 0 |
T06-0 | 2 | Erosion | | Left Bank | 68.54 | Height | 4 | ----- | 0 |
T06-0 | 2 | Erosion | | Left Bank | 118.15 | Height | 3 | ----- | 0 |
T06-0 | 2 | Erosion | | Left Bank | 181.83 | Height | 6 | ----- | 0 |
T06-0 | 2 | Erosion | | Right Bank | 102.02 | Height | 4 | ----- | 0 |
T06-0 | 2 | Erosion | | Right Bank | 165.62 | Height | 4 | ----- | 0 |
T06-0 | 2 | Erosion | | Right Bank | 181.45 | Height | 3 | ----- | 0 |
T06-0 | 2 | Erosion | | Right Bank | 231.13 | Height | 3 | ----- | 0 |
T06-0 | 2 | Erosion | | Right Bank | 666.96 | Height | 6 | ----- | 0 |
T06-0 | 2 | Erosion | | Right Bank | 915.5 | Height | 5 | ----- | 0 |
T06-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T06-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T06-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T06-0 | 2 | Straightening | Straightening | | 2933.94 | ----- | 0 | ----- | 0 |
T07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 155.69 | ----- | 0 | ----- | 0 |
T07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 260.15 | ----- | 0 | ----- | 0 |
T07-0 | 2 | Buffers Less than 25 feet | | Right Bank | 468.37 | ----- | 0 | ----- | 0 |
T07-0 | 2 | Buffers Less than 25 feet | | Right Bank | 502.49 | ----- | 0 | ----- | 0 |
T07-0 | 2 | Buffers Less than 25 feet | | Right Bank | 699.28 | ----- | 0 | ----- | 0 |
T07-0 | 2 | Cross Section Location | Representative | | 0 | Number | 0 | ----- | 0 |
T07-0 | 2 | Development | | One Side | 170.76 | ----- | 0 | ----- | 0 |
T07-0 | 2 | Encroachment | Road | One Side | 5.72 | Height | 0 | ----- | 0 |
T07-0 | 2 | Encroachment | Road | One Side | 2100.84 | Height | 8 | ----- | 0 |
T07-0 | 2 | Erosion | | Left Bank | 212.46 | Height | 5 | ----- | 0 |
T07-0 | 2 | Erosion | | Left Bank | 285.65 | Height | 4 | ----- | 0 |
T07-0 | 2 | Erosion | | Right Bank | 108.95 | Height | 4 | ----- | 0 |
T07-0 | 2 | Erosion | | Right Bank | 133.79 | Height | 4 | ----- | 0 |
T07-0 | 2 | Erosion | | Right Bank | 308.38 | Height | 4 | ----- | 0 |
T07-0 | 2 | Erosion | | Right Bank | 719.88 | Height | 4 | ----- | 0 |
T07-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T07-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T07-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T07-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T07-0 | 2 | Straightening | Straightening | | 167.48 | ----- | 0 | ----- | 0 |
T07-0 | 2 | Straightening | Straightening | | 287.63 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 37.92 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 51.83 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 29.47 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 103.15 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 58.13 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 255.27 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 275.71 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 490.64 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 80 | ----- | 0 |
T08-0 | 2 | Buffers Less than 25 feet | | Left Bank | 346.64 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Buffers Less than 25 feet | | Left Bank | 434.85 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Buffers Less than 25 feet | | Left Bank | 447.51 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Buffers Less than 25 feet | | Left Bank | 619.09 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Buffers Less than 25 feet | | Right Bank | 80.62 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Buffers Less than 25 feet | | Right Bank | 357.26 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Buffers Less than 25 feet | | Right Bank | 407.26 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Buffers Less than 25 feet | | Right Bank | 652.89 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Cross Section Location | Representative | | 0 | Number | 0 | ----- | 0 |
T08-0 | 2 | Development | | Both Sides | 43.14 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Development | | One Side | 66.46 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Development | | One Side | 95.15 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Development | | One Side | 558.95 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Dredging | Gravel Mining | General Location | 0 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Encroachment | Road | One Side | 798.2 | Height | 0 | ----- | 0 |
T08-0 | 2 | Encroachment | Road | One Side | 1907.83 | Height | 0 | ----- | 0 |
T08-0 | 2 | Erosion | | Left Bank | 190.05 | Height | 4 | ----- | 0 |
T08-0 | 2 | Erosion | | Left Bank | 254.51 | Height | 4 | ----- | 0 |
T08-0 | 2 | Erosion | | Left Bank | 293.66 | Height | 6 | ----- | 0 |
T08-0 | 2 | Erosion | | Right Bank | 46.42 | Height | 10 | ----- | 0 |
T08-0 | 2 | Erosion | | Right Bank | 82.47 | Height | 3 | ----- | 0 |
T08-0 | 2 | Erosion | | Right Bank | 91 | Height | 3 | ----- | 0 |
T08-0 | 2 | Erosion | | Right Bank | 110.25 | Height | 4 | ----- | 0 |
T08-0 | 2 | Migration | Avulsion | | 0 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Straightening | Straightening | | 232.69 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Straightening | Straightening | | 288.58 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Straightening | Straightening | | 369.6 | ----- | 0 | ----- | 0 |
T08-0 | 2 | Stream Crossing | Animal Crossing | | 0 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 142.75 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 227.43 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 368.11 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Buffers Less than 25 feet | | Left Bank | 417.63 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Buffers Less than 25 feet | | Right Bank | 51.14 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Buffers Less than 25 feet | | Right Bank | 306.52 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Buffers Less than 25 feet | | Right Bank | 360.73 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Buffers Less than 25 feet | | Right Bank | 741.19 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Cross Section Location | Representative | | 0 | Number | 0 | ----- | 0 |
T09-0 | 2 | Development | | One Side | 627.19 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Development | | One Side | 1034.01 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Dredging | Gravel Mining | General Location | 0 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Encroachment | Berm | Both Sides | 147.99 | Height | 0 | ----- | 0 |
T09-0 | 2 | Encroachment | Berm | Both Sides | 1984.45 | Height | 0 | ----- | 0 |
T09-0 | 2 | Erosion | | Left Bank | 76.98 | Height | 4 | ----- | 0 |
T09-0 | 2 | Erosion | | Left Bank | 120.42 | Height | 4 | ----- | 0 |
T09-0 | 2 | Erosion | | Left Bank | 126.67 | Height | 6 | ----- | 0 |
T09-0 | 2 | Erosion | | Left Bank | 131.03 | Height | 5 | ----- | 0 |
T09-0 | 2 | Erosion | | Left Bank | 225.26 | Height | 5 | ----- | 0 |
T09-0 | 2 | Erosion | | Right Bank | 62.04 | Height | 5 | ----- | 0 |
T09-0 | 2 | Erosion | | Right Bank | 76.15 | Height | 4 | ----- | 0 |
T09-0 | 2 | Erosion | | Right Bank | 209.47 | Height | 5 | ----- | 0 |
T09-0 | 2 | Erosion | | Right Bank | 217.51 | Height | 6 | ----- | 0 |
T09-0 | 2 | Mass Failure | | Left Bank | 138.3 | Height | 15 | ----- | 0 |
T09-0 | 2 | Migration | Avulsion | | 0 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Straightening | Straightening | | 92.6 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Straightening | Straightening | | 226.46 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Straightening | Straightening | | 472.8 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T09-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T10-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 455.54 | ----- | 0 | ----- | 0 |
T10-A | 2 | Bridge or Culvert | Bridge | | 0 | Length | 50 | ----- | 0 |
T10-A | 2 | Buffers Less than 25 feet | | Right Bank | 611.48 | ----- | 0 | ----- | 0 |
T10-A | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T10-A | 2 | Encroachment | Road | One Side | 3.24 | Height | 0 | ----- | 0 |
T10-A | 2 | Encroachment | Road | One Side | 601.71 | Height | 12 | ----- | 0 |
T10-A | 2 | Erosion | | Left Bank | 218.26 | Height | 7 | ----- | 0 |
T10-A | 2 | Erosion | | Right Bank | 63.08 | Height | 5 | ----- | 0 |
T10-A | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T10-A | 2 | Straightening | Straightening | | 597.52 | ----- | 0 | ----- | 0 |
T10-B | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 232.12 | ----- | 0 | ----- | 0 |
T10-B | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 325.6 | ----- | 0 | ----- | 0 |
T10-B | 2 | Buffers Less than 25 feet | | Right Bank | 51.58 | ----- | 0 | ----- | 0 |
T10-B | 2 | Buffers Less than 25 feet | | Right Bank | 169.56 | ----- | 0 | ----- | 0 |
T10-B | 2 | Buffers Less than 25 feet | | Right Bank | 228 | ----- | 0 | ----- | 0 |
T10-B | 2 | Cross Section Location | Representative | | 0 | Number | 2 | ----- | 0 |
T10-B | 2 | Development | | One Side | 1168.71 | ----- | 0 | ----- | 0 |
T10-B | 2 | Encroachment | Road | One Side | 2241.77 | Height | 0 | ----- | 0 |
T10-B | 2 | Erosion | | Left Bank | 82.42 | Height | 10 | ----- | 0 |
T10-B | 2 | Erosion | | Left Bank | 139.15 | Height | 5 | ----- | 0 |
T10-B | 2 | Erosion | | Left Bank | 146.84 | Height | 10 | ----- | 0 |
T10-B | 2 | Erosion | | Left Bank | 397.24 | Height | 5 | ----- | 0 |
T10-B | 2 | Erosion | | Right Bank | 87.85 | Height | 5 | ----- | 0 |
T10-B | 2 | Mass Failure | | Left Bank | 39.14 | Height | 30 | ----- | 0 |
T10-B | 2 | Mass Failure | | Left Bank | 74.84 | Height | 100 | ----- | 0 |
T10-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T10-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T10-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T10-B | 2 | Straightening | Straightening | | 172.73 | ----- | 0 | ----- | 0 |
T10-B | 2 | Straightening | Straightening | | 300.17 | ----- | 0 | ----- | 0 |
T10-C | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 100.12 | ----- | 0 | ----- | 0 |
T10-C | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 115.83 | ----- | 0 | ----- | 0 |
T10-C | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 71.55 | ----- | 0 | ----- | 0 |
T10-C | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 242.4 | ----- | 0 | ----- | 0 |
T10-C | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 1175.65 | ----- | 0 | ----- | 0 |
T10-C | 2 | Bridge or Culvert | Bridge | | 0 | Length | 180 | ----- | 0 |
T10-C | 2 | Buffers Less than 25 feet | | Left Bank | 210.48 | ----- | 0 | ----- | 0 |
T10-C | 2 | Buffers Less than 25 feet | | Right Bank | 69.35 | ----- | 0 | ----- | 0 |
T10-C | 2 | Buffers Less than 25 feet | | Right Bank | 255.05 | ----- | 0 | ----- | 0 |
T10-C | 2 | Buffers Less than 25 feet | | Right Bank | 326.2 | ----- | 0 | ----- | 0 |
T10-C | 2 | Buffers Less than 25 feet | | Right Bank | 373.74 | ----- | 0 | ----- | 0 |
T10-C | 2 | Cross Section Location | Representative | | 0 | Number | 3 | ----- | 0 |
T10-C | 2 | Development | | One Side | 164.99 | ----- | 0 | ----- | 0 |
T10-C | 2 | Development | | One Side | 353.57 | ----- | 0 | ----- | 0 |
T10-C | 2 | Development | | One Side | 463.17 | ----- | 0 | ----- | 0 |
T10-C | 2 | Development | | One Side | 835.73 | ----- | 0 | ----- | 0 |
T10-C | 2 | Dredging | Gravel Mining | Exact Location | 0 | ----- | 0 | ----- | 0 |
T10-C | 2 | Encroachment | Road | One Side | 1421.63 | Height | 15 | ----- | 0 |
T10-C | 2 | Erosion | | Left Bank | 35.22 | Height | 4 | ----- | 0 |
T10-C | 2 | Erosion | | Left Bank | 58.42 | Height | 4 | ----- | 0 |
T10-C | 2 | Erosion | | Left Bank | 59.82 | Height | 6 | ----- | 0 |
T10-C | 2 | Erosion | | Left Bank | 116.08 | Height | 3 | ----- | 0 |
T10-C | 2 | Erosion | | Left Bank | 206.77 | Height | 6 | ----- | 0 |
T10-C | 2 | Erosion | | Left Bank | 237.25 | Height | 4 | ----- | 0 |
T10-C | 2 | Erosion | | Left Bank | 364.25 | Height | 10 | ----- | 0 |
T10-C | 2 | Erosion | | Left Bank | 442.32 | Height | 4 | ----- | 0 |
T10-C | 2 | Erosion | | Right Bank | 36.67 | Height | 3 | ----- | 0 |
T10-C | 2 | Erosion | | Right Bank | 88.15 | Height | 3 | ----- | 0 |
T10-C | 2 | Erosion | | Right Bank | 398.88 | Height | 5 | ----- | 0 |
T10-C | 2 | Mass Failure | | Left Bank | 66.1 | Height | 25 | ----- | 0 |
T10-C | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T10-C | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T10-C | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T10-C | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T10-C | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T10-C | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T10-C | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T10-C | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T10-C | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T10-C | 2 | Straightening | Straightening | | 92.17 | ----- | 0 | ----- | 0 |
T10-C | 2 | Straightening | Straightening | | 246.23 | ----- | 0 | ----- | 0 |
T10-C | 2 | Straightening | Straightening | | 1329.79 | ----- | 0 | ----- | 0 |
T10-C | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T10-C | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T10.01-0 | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 33.61 | ----- | 0 | ----- | 0 |
T10.01-0 | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 46.95 | ----- | 0 | ----- | 0 |
T10.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 311.7 | ----- | 0 | ----- | 0 |
T10.01-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 50 | ----- | 0 |
T10.01-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 85 | ----- | 0 |
T10.01-0 | 2 | Buffers Less than 25 feet | | Left Bank | 91.78 | ----- | 0 | ----- | 0 |
T10.01-0 | 2 | Buffers Less than 25 feet | | Right Bank | 115.29 | ----- | 0 | ----- | 0 |
T10.01-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T10.01-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T10.01-0 | 2 | Development | | Both Sides | 139.22 | ----- | 0 | ----- | 0 |
T10.01-0 | 2 | Development | | One Side | 71.55 | ----- | 0 | ----- | 0 |
T10.01-0 | 2 | Encroachment | Road | One Side | 1099.27 | Height | 8 | ----- | 0 |
T10.01-0 | 2 | Erosion | | Left Bank | 92.78 | Height | 5 | ----- | 0 |
T10.01-0 | 2 | Erosion | | Left Bank | 96.55 | Height | 3 | ----- | 0 |
T10.01-0 | 2 | Erosion | | Left Bank | 106.65 | Height | 5 | ----- | 0 |
T10.01-0 | 2 | Erosion | | Left Bank | 128.23 | Height | 5 | ----- | 0 |
T10.01-0 | 2 | Erosion | | Left Bank | 138.3 | Height | 8 | ----- | 0 |
T10.01-0 | 2 | Erosion | | Left Bank | 203.1 | Height | 9 | ----- | 0 |
T10.01-0 | 2 | Erosion | | Left Bank | 218.03 | Height | 4 | ----- | 0 |
T10.01-0 | 2 | Erosion | | Right Bank | 63.4 | Height | 8 | ----- | 0 |
T10.01-0 | 2 | Erosion | | Right Bank | 89.29 | Height | 6 | ----- | 0 |
T10.01-0 | 2 | Erosion | | Right Bank | 99.27 | Height | 4 | ----- | 0 |
T10.01-0 | 2 | Erosion | | Right Bank | 106.03 | Height | 9 | ----- | 0 |
T10.01-0 | 2 | Mass Failure | | Left Bank | 76.51 | Height | 30 | ----- | 0 |
T10.01-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
T10.01-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T10.01-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T10.01-0 | 2 | Straightening | Straightening | | 546.58 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 168.51 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 433.21 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 75 | ----- | 0 |
T11-0 | 2 | Buffers Less than 25 feet | | Left Bank | 240.5 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Buffers Less than 25 feet | | Left Bank | 564.05 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Buffers Less than 25 feet | | Right Bank | 56.12 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Buffers Less than 25 feet | | Right Bank | 317.53 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Buffers Less than 25 feet | | Right Bank | 322.57 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Buffers Less than 25 feet | | Right Bank | 513.34 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Development | | Both Sides | 48.93 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Development | | One Side | 63.31 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Dredging | Gravel Mining | General Location | 0 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Encroachment | Road | One Side | 1539.81 | Height | 12 | ----- | 0 |
T11-0 | 2 | Encroachment | Road | One Side | 2492.6 | Height | 12 | ----- | 0 |
T11-0 | 2 | Erosion | | Left Bank | 87.39 | Height | 5 | ----- | 0 |
T11-0 | 2 | Erosion | | Left Bank | 112.39 | Height | 5 | ----- | 0 |
T11-0 | 2 | Erosion | | Left Bank | 124.72 | Height | 6 | ----- | 0 |
T11-0 | 2 | Erosion | | Left Bank | 192.47 | Height | 8 | ----- | 0 |
T11-0 | 2 | Erosion | | Left Bank | 196.61 | Height | 4 | ----- | 0 |
T11-0 | 2 | Erosion | | Left Bank | 224.54 | Height | 5 | ----- | 0 |
T11-0 | 2 | Erosion | | Left Bank | 502.06 | Height | 7 | ----- | 0 |
T11-0 | 2 | Erosion | | Right Bank | 36.86 | Height | 5 | ----- | 0 |
T11-0 | 2 | Erosion | | Right Bank | 148.59 | Height | 6 | ----- | 0 |
T11-0 | 2 | Erosion | | Right Bank | 170.71 | Height | 7 | ----- | 0 |
T11-0 | 2 | Erosion | | Right Bank | 266.42 | Height | 5 | ----- | 0 |
T11-0 | 2 | Erosion | | Right Bank | 299.33 | Height | 5 | ----- | 0 |
T11-0 | 2 | Erosion | | Right Bank | 305.5 | Height | 7 | ----- | 0 |
T11-0 | 2 | Mass Failure | | Left Bank | 92.48 | Height | 30 | ----- | 0 |
T11-0 | 2 | Mass Failure | | Right Bank | 112.44 | Height | 15 | ----- | 0 |
T11-0 | 2 | Mass Failure | | Right Bank | 158.38 | Height | 15 | ----- | 0 |
T11-0 | 2 | Migration | Avulsion | | 0 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Straightening | Straightening | | 187.74 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Straightening | Straightening | | 230.78 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T11-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T12-A | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T12-A | 2 | Development | | One Side | 162.51 | ----- | 0 | ----- | 0 |
T12-A | 2 | Dredging | Gravel Mining | General Location | 0 | ----- | 0 | ----- | 0 |
T12-A | 2 | Encroachment | Road | One Side | 3.15 | Height | 12 | ----- | 0 |
T12-A | 2 | Encroachment | Road | One Side | 1230.58 | Height | 18 | ----- | 0 |
T12-A | 2 | Erosion | | Left Bank | 125.99 | Height | 6 | ----- | 0 |
T12-A | 2 | Erosion | | Left Bank | 133.64 | Height | 6 | ----- | 0 |
T12-A | 2 | Erosion | | Left Bank | 338.19 | Height | 8 | ----- | 0 |
T12-A | 2 | Erosion | | Right Bank | 85.45 | Height | 8 | ----- | 0 |
T12-A | 2 | Erosion | | Right Bank | 114.9 | Height | 6 | ----- | 0 |
T12-A | 2 | Erosion | | Right Bank | 413.78 | Height | 9 | ----- | 0 |
T12-A | 2 | Mass Failure | | Left Bank | 47.47 | Height | 25 | ----- | 0 |
T12-A | 2 | Mass Failure | | Right Bank | 50.17 | Height | 15 | ----- | 0 |
T12-A | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T12-B | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 40.25 | ----- | 0 | ----- | 0 |
T12-B | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 47.8 | ----- | 0 | ----- | 0 |
T12-B | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 81.98 | ----- | 0 | ----- | 0 |
T12-B | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 24.93 | ----- | 0 | ----- | 0 |
T12-B | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 125.97 | ----- | 0 | ----- | 0 |
T12-B | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 177.19 | ----- | 0 | ----- | 0 |
T12-B | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 345.7 | ----- | 0 | ----- | 0 |
T12-B | 2 | Bridge or Culvert | Bridge | | 0 | Length | 200 | ----- | 0 |
T12-B | 2 | Buffers Less than 25 feet | | Left Bank | 189.74 | ----- | 0 | ----- | 0 |
T12-B | 2 | Buffers Less than 25 feet | | Left Bank | 215.92 | ----- | 0 | ----- | 0 |
T12-B | 2 | Buffers Less than 25 feet | | Left Bank | 217.65 | ----- | 0 | ----- | 0 |
T12-B | 2 | Buffers Less than 25 feet | | Right Bank | 123.87 | ----- | 0 | ----- | 0 |
T12-B | 2 | Cross Section Location | Representative | | 0 | Number | 2 | ----- | 0 |
T12-B | 2 | Development | | Both Sides | 41.68 | ----- | 0 | ----- | 0 |
T12-B | 2 | Development | | One Side | 416.71 | ----- | 0 | ----- | 0 |
T12-B | 2 | Development | | One Side | 602.75 | ----- | 0 | ----- | 0 |
T12-B | 2 | Encroachment | Road | One Side | 599.97 | Height | 0 | ----- | 0 |
T12-B | 2 | Erosion | | Left Bank | 50.32 | Height | 6 | ----- | 0 |
T12-B | 2 | Erosion | | Left Bank | 54 | Height | 3 | ----- | 0 |
T12-B | 2 | Erosion | | Left Bank | 90.44 | Height | 5 | ----- | 0 |
T12-B | 2 | Erosion | | Left Bank | 106.62 | Height | 7 | ----- | 0 |
T12-B | 2 | Erosion | | Left Bank | 127.73 | Height | 6 | ----- | 0 |
T12-B | 2 | Erosion | | Left Bank | 152.36 | Height | 6 | ----- | 0 |
T12-B | 2 | Erosion | | Left Bank | 159.01 | Height | 6 | ----- | 0 |
T12-B | 2 | Erosion | | Right Bank | 93.25 | Height | 4 | ----- | 0 |
T12-B | 2 | Erosion | | Right Bank | 229.05 | Height | 8 | ----- | 0 |
T12-B | 2 | Erosion | | Right Bank | 308.44 | Height | 5 | ----- | 0 |
T12-B | 2 | Mass Failure | | Left Bank | 53.22 | Height | 20 | ----- | 0 |
T12-B | 2 | Mass Failure | | Left Bank | 153.11 | Height | 40 | ----- | 0 |
T12-B | 2 | Mass Failure | | Left Bank | 214.42 | Height | 35 | ----- | 0 |
T12-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T12-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T12-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T12-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T12-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T12-B | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T12-B | 2 | Straightening | Straightening | | 125.31 | ----- | 0 | ----- | 0 |
T12-B | 2 | Straightening | Straightening | | 187.27 | ----- | 0 | ----- | 0 |
T12-B | 2 | Straightening | Straightening | | 211.69 | ----- | 0 | ----- | 0 |
T13-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 97.24 | ----- | 0 | ----- | 0 |
T13-0 | 2 | Buffers Less than 25 feet | | Left Bank | 58.51 | ----- | 0 | ----- | 0 |
T13-0 | 2 | Buffers Less than 25 feet | | Right Bank | 35.19 | ----- | 0 | ----- | 0 |
T13-0 | 2 | Buffers Less than 25 feet | | Right Bank | 143.15 | ----- | 0 | ----- | 0 |
T13-0 | 2 | Cross Section Location | Representative | | 0 | Number | 0 | ----- | 0 |
T13-0 | 2 | Encroachment | Road | One Side | 788.11 | Height | 0 | ----- | 0 |
T13-0 | 2 | Erosion | | Left Bank | 24.57 | Height | 6 | ----- | 0 |
T13-0 | 2 | Erosion | | Left Bank | 57.69 | Height | 4 | ----- | 0 |
T13-0 | 2 | Erosion | | Left Bank | 73.96 | Height | 3 | ----- | 0 |
T13-0 | 2 | Erosion | | Left Bank | 74.87 | Height | 7 | ----- | 0 |
T13-0 | 2 | Erosion | | Left Bank | 128.45 | Height | 3 | ----- | 0 |
T13-0 | 2 | Erosion | | Left Bank | 131.5 | Height | 5 | ----- | 0 |
T13-0 | 2 | Erosion | | Left Bank | 248.88 | Height | 5 | ----- | 0 |
T13-0 | 2 | Erosion | | Left Bank | 265.18 | Height | 4 | ----- | 0 |
T13-0 | 2 | Erosion | | Right Bank | 64.6 | Height | 4 | ----- | 0 |
T13-0 | 2 | Erosion | | Right Bank | 143.56 | Height | 4 | ----- | 0 |
T13-0 | 2 | Erosion | | Right Bank | 158.94 | Height | 5 | ----- | 0 |
T13-0 | 2 | Erosion | | Right Bank | 209.74 | Height | 4 | ----- | 0 |
T13-0 | 2 | Erosion | | Right Bank | 284.81 | Height | 5 | ----- | 0 |
T13-0 | 2 | Erosion | | Right Bank | 305.48 | Height | 4 | ----- | 0 |
T13-0 | 2 | Erosion | | Right Bank | 400.32 | Height | 5 | ----- | 0 |
T13-0 | 2 | Mass Failure | | Left Bank | 32.46 | Height | 30 | ----- | 0 |
T13-0 | 2 | Mass Failure | | Right Bank | 37.98 | Height | 15 | ----- | 0 |
T13-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T13-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T13-0 | 2 | Straightening | Straightening | | 696.26 | ----- | 0 | ----- | 0 |
T13-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T14-A | 2 | Cross Section Location | Representative | | 0 | Number | 2 | ----- | 0 |
T14-A | 2 | Erosion | | Left Bank | 87.09 | Height | 5 | ----- | 0 |
T14-A | 2 | Erosion | | Left Bank | 112.89 | Height | 5 | ----- | 0 |
T14-A | 2 | Erosion | | Left Bank | 176.57 | Height | 3 | ----- | 0 |
T14-A | 2 | Erosion | | Right Bank | 79.31 | Height | 5 | ----- | 0 |
T14-A | 2 | Erosion | | Right Bank | 113.85 | Height | 4 | ----- | 0 |
T14-A | 2 | Erosion | | Right Bank | 143.3 | Height | 5 | ----- | 0 |
T14-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T14-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T14-B | 2 | Beaver Dam | | | 0 | Length | 800 | ----- | 0 |
T14-B | 2 | Bridge or Culvert | Bridge | | 0 | Length | 75 | ----- | 0 |
T14-B | 2 | Erosion | | Right Bank | 181.54 | Height | 5 | ----- | 0 |
T14-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T14-C | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 40.55 | ----- | 0 | ----- | 0 |
T14-C | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 58.49 | ----- | 0 | ----- | 0 |
T14-C | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 26.2 | ----- | 0 | ----- | 0 |
T14-C | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 39.49 | ----- | 0 | ----- | 0 |
T14-C | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 41.91 | ----- | 0 | ----- | 0 |
T14-C | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 72.39 | ----- | 0 | ----- | 0 |
T14-C | 2 | Bridge or Culvert | Bridge | | 0 | Length | 200 | ----- | 0 |
T14-C | 2 | Buffers Less than 25 feet | | Right Bank | 99.06 | ----- | 0 | ----- | 0 |
T14-C | 2 | Development | | Both Sides | 50.11 | ----- | 0 | ----- | 0 |
T14-C | 2 | Development | | One Side | 175.95 | ----- | 0 | ----- | 0 |
T14-C | 2 | Erosion | | Left Bank | 62.93 | Height | 5 | ----- | 0 |
T14-C | 2 | Erosion | | Left Bank | 67.12 | Height | 5 | ----- | 0 |
T14-C | 2 | Erosion | | Left Bank | 82.33 | Height | 5 | ----- | 0 |
T14-C | 2 | Erosion | | Left Bank | 102 | Height | 5 | ----- | 0 |
T14-C | 2 | Erosion | | Left Bank | 132.63 | Height | 4 | ----- | 0 |
T14-C | 2 | Erosion | | Left Bank | 194.88 | Height | 8 | ----- | 0 |
T14-C | 2 | Erosion | | Left Bank | 232.18 | Height | 5 | ----- | 0 |
T14-C | 2 | Erosion | | Left Bank | 237.28 | Height | 4 | ----- | 0 |
T14-C | 2 | Erosion | | Left Bank | 632.13 | Height | 5 | ----- | 0 |
T14-C | 2 | Erosion | | Right Bank | 42.47 | Height | 5 | ----- | 0 |
T14-C | 2 | Erosion | | Right Bank | 71.13 | Height | 5 | ----- | 0 |
T14-C | 2 | Erosion | | Right Bank | 108.58 | Height | 5 | ----- | 0 |
T14-C | 2 | Erosion | | Right Bank | 113.83 | Height | 5 | ----- | 0 |
T14-C | 2 | Erosion | | Right Bank | 238.39 | Height | 4 | ----- | 0 |
T14-C | 2 | Erosion | | Right Bank | 435.69 | Height | 6 | ----- | 0 |
T14-C | 2 | Mass Failure | | Left Bank | 62.16 | Height | 20 | ----- | 0 |
T14-C | 2 | Mass Failure | | Left Bank | 80.48 | Height | 20 | ----- | 0 |
T14-C | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T14-C | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T14-C | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T14-C | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T14-C | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T14-C | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T15-A | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 137.52 | ----- | 0 | ----- | 0 |
T15-A | 2 | Buffers Less than 25 feet | | Left Bank | 72.8 | ----- | 0 | ----- | 0 |
T15-A | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T15-A | 2 | Erosion | | Left Bank | 46.29 | Height | 3 | ----- | 0 |
T15-A | 2 | Erosion | | Left Bank | 65.86 | Height | 5 | ----- | 0 |
T15-A | 2 | Erosion | | Left Bank | 81.7 | Height | 5 | ----- | 0 |
T15-A | 2 | Erosion | | Left Bank | 142.11 | Height | 5 | ----- | 0 |
T15-A | 2 | Erosion | | Left Bank | 360.34 | Height | 4 | ----- | 0 |
T15-A | 2 | Erosion | | Right Bank | 80.99 | Height | 4 | ----- | 0 |
T15-A | 2 | Erosion | | Right Bank | 108.19 | Height | 5 | ----- | 0 |
T15-A | 2 | Erosion | | Right Bank | 147.8 | Height | 5 | ----- | 0 |
T15-A | 2 | Erosion | | Right Bank | 153.61 | Height | 4 | ----- | 0 |
T15-A | 2 | Erosion | | Right Bank | 199.77 | Height | 5 | ----- | 0 |
T15-A | 2 | Erosion | | Right Bank | 212.76 | Height | 5 | ----- | 0 |
T15-A | 2 | Mass Failure | | Right Bank | 50.91 | Height | 20 | ----- | 0 |
T15-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T15-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T15-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T15-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T15-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T15-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T15-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T15-A | 2 | Straightening | Straightening | | 135.74 | ----- | 0 | ----- | 0 |
T15-B | 2 | Cross Section Location | Representative | | 0 | Number | 2 | ----- | 0 |
T15-B | 2 | Erosion | | Left Bank | 100.55 | Height | 3 | ----- | 0 |
T15-B | 2 | Erosion | | Right Bank | 85.95 | Height | 4 | ----- | 0 |
T15-B | 2 | Erosion | | Right Bank | 144.11 | Height | 4 | ----- | 0 |
T15-B | 2 | Mass Failure | | Right Bank | 44.25 | Height | 15 | ----- | 0 |
T15-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T15-B | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T15-C | 2 | Buffers Less than 25 feet | | Left Bank | 309.68 | ----- | 0 | ----- | 0 |
T15-C | 2 | Cross Section Location | Representative | | 0 | Number | 3 | ----- | 0 |
T15-C | 2 | Erosion | | Left Bank | 51.75 | Height | 5 | ----- | 0 |
T15-C | 2 | Erosion | | Right Bank | 41.69 | Height | 4 | ----- | 0 |
T15-C | 2 | Erosion | | Right Bank | 64.86 | Height | 4 | ----- | 0 |
T15-C | 2 | Erosion | | Right Bank | 290.65 | Height | 7 | ----- | 0 |
T15-C | 2 | Grade Control | Ledge | Picture | 0 | Height | 4 | HtAbvWater | 1 |
T15-C | 2 | Grade Control | Ledge | Picture | 0 | Height | 4 | HtAbvWater | 2 |
T15-C | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T15-C | 2 | Stream Crossing | Animal Crossing | | 0 | ----- | 0 | ----- | 0 |
T15-C | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 26.33 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 47.35 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 76.61 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 32.53 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 58.03 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 47.35 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 87.44 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 108.4 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 43.61 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 48.02 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 55.46 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 115 | ----- | 0 |
T16-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 150 | ----- | 0 |
T16-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 175 | ----- | 0 |
T16-0 | 2 | Buffers Less than 25 feet | | Left Bank | 38.58 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Buffers Less than 25 feet | | Left Bank | 41.26 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Buffers Less than 25 feet | | Left Bank | 72.24 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Buffers Less than 25 feet | | Left Bank | 97.08 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Buffers Less than 25 feet | | Right Bank | 110.58 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Buffers Less than 25 feet | | Right Bank | 318.97 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Buffers Less than 25 feet | | Right Bank | 509.2 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T16-0 | 2 | Development | | Both Sides | 35.8 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Development | | Both Sides | 51.28 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Development | | One Side | 47.45 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Development | | One Side | 123.53 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Development | | One Side | 279.7 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Dredging | Gravel Mining | General Location | 0 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Dredging | Gravel Mining | General Location | 0 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Dredging | Gravel Mining | General Location | 0 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Dredging | Gravel Mining | General Location | 0 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Encroachment | Road | One Side | 470.03 | Height | 9 | ----- | 0 |
T16-0 | 2 | Encroachment | Road | One Side | 629 | Height | 0 | ----- | 0 |
T16-0 | 2 | Erosion | | Left Bank | 28.26 | Height | 5 | ----- | 0 |
T16-0 | 2 | Erosion | | Left Bank | 36.59 | Height | 3 | ----- | 0 |
T16-0 | 2 | Erosion | | Left Bank | 48.25 | Height | 3 | ----- | 0 |
T16-0 | 2 | Erosion | | Left Bank | 58.95 | Height | 4 | ----- | 0 |
T16-0 | 2 | Erosion | | Left Bank | 66.16 | Height | 4 | ----- | 0 |
T16-0 | 2 | Erosion | | Left Bank | 82.54 | Height | 4 | ----- | 0 |
T16-0 | 2 | Erosion | | Left Bank | 108.08 | Height | 5 | ----- | 0 |
T16-0 | 2 | Erosion | | Left Bank | 112.49 | Height | 4 | ----- | 0 |
T16-0 | 2 | Erosion | | Left Bank | 114.12 | Height | 3 | ----- | 0 |
T16-0 | 2 | Erosion | | Left Bank | 118.91 | Height | 3 | ----- | 0 |
T16-0 | 2 | Erosion | | Left Bank | 131.06 | Height | 3 | ----- | 0 |
T16-0 | 2 | Erosion | | Left Bank | 177.01 | Height | 5 | ----- | 0 |
T16-0 | 2 | Erosion | | Left Bank | 294.68 | Height | 5 | ----- | 0 |
T16-0 | 2 | Erosion | | Right Bank | 38.4 | Height | 2 | ----- | 0 |
T16-0 | 2 | Erosion | | Right Bank | 40.26 | Height | 2 | ----- | 0 |
T16-0 | 2 | Erosion | | Right Bank | 54.95 | Height | 4 | ----- | 0 |
T16-0 | 2 | Erosion | | Right Bank | 55.73 | Height | 4 | ----- | 0 |
T16-0 | 2 | Erosion | | Right Bank | 65.67 | Height | 3 | ----- | 0 |
T16-0 | 2 | Erosion | | Right Bank | 66.46 | Height | 3 | ----- | 0 |
T16-0 | 2 | Erosion | | Right Bank | 73.29 | Height | 4 | ----- | 0 |
T16-0 | 2 | Erosion | | Right Bank | 77.67 | Height | 5 | ----- | 0 |
T16-0 | 2 | Erosion | | Right Bank | 85.14 | Height | 3 | ----- | 0 |
T16-0 | 2 | Erosion | | Right Bank | 94.41 | Height | 4 | ----- | 0 |
T16-0 | 2 | Erosion | | Right Bank | 105.02 | Height | 5 | ----- | 0 |
T16-0 | 2 | Erosion | | Right Bank | 105.87 | Height | 5 | ----- | 0 |
T16-0 | 2 | Erosion | | Right Bank | 109.36 | Height | 4 | ----- | 0 |
T16-0 | 2 | Erosion | | Right Bank | 166.12 | Height | 4 | ----- | 0 |
T16-0 | 2 | Erosion | | Right Bank | 212.29 | Height | 3 | ----- | 0 |
T16-0 | 2 | Erosion | | Right Bank | 239.74 | Height | 5 | ----- | 0 |
T16-0 | 2 | Erosion | | Right Bank | 263 | Height | 4 | ----- | 0 |
T16-0 | 2 | Mass Failure | | Left Bank | 30.78 | Height | 12 | ----- | 0 |
T16-0 | 2 | Mass Failure | | Left Bank | 73.35 | Height | 30 | ----- | 0 |
T16-0 | 2 | Mass Failure | | Right Bank | 36.78 | Height | 15 | ----- | 0 |
T16-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Straightening | Straightening | | 656.65 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Straightening | Straightening | | 1302.62 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Stream Crossing | Animal Crossing | | 0 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Stream Crossing | Animal Crossing | | 0 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T16-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T17-A | 2 | Buffers Less than 25 feet | | Left Bank | 71.26 | ----- | 0 | ----- | 0 |
T17-A | 2 | Buffers Less than 25 feet | | Right Bank | 217.2 | ----- | 0 | ----- | 0 |
T17-A | 2 | Cross Section Location | Representative | | 0 | Number | 2 | ----- | 0 |
T17-A | 2 | Erosion | | Left Bank | 57.51 | Height | 4 | ----- | 0 |
T17-A | 2 | Erosion | | Left Bank | 106.99 | Height | 3 | ----- | 0 |
T17-A | 2 | Erosion | | Left Bank | 152.36 | Height | 5 | ----- | 0 |
T17-A | 2 | Erosion | | Right Bank | 89.35 | Height | 4 | ----- | 0 |
T17-A | 2 | Erosion | | Right Bank | 138.76 | Height | 4 | ----- | 0 |
T17-A | 2 | Erosion | | Right Bank | 173.51 | Height | 5 | ----- | 0 |
T17-A | 2 | Mass Failure | | Right Bank | 86.66 | Height | 30 | ----- | 0 |
T17-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T17-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T17-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T17-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T17-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T17-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T17-A | 2 | Stream Crossing | Animal Crossing | | 0 | ----- | 0 | ----- | 0 |
T17-B | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T17-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T17-B | 2 | Erosion | | Left Bank | 65.51 | Height | 5 | ----- | 0 |
T17-B | 2 | Erosion | | Left Bank | 143.4 | Height | 5 | ----- | 0 |
T17-B | 2 | Erosion | | Left Bank | 166.12 | Height | 8 | ----- | 0 |
T17-B | 2 | Erosion | | Left Bank | 171.84 | Height | 4 | ----- | 0 |
T17-B | 2 | Erosion | | Right Bank | 56.62 | Height | 4 | ----- | 0 |
T17-B | 2 | Erosion | | Right Bank | 195.69 | Height | 3 | ----- | 0 |
T17-B | 2 | Erosion | | Right Bank | 208.59 | Height | 4 | ----- | 0 |
T17-B | 2 | Mass Failure | | Right Bank | 34.43 | Height | 40 | ----- | 0 |
T17-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T17-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T18-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T18-0 | 2 | Encroachment | Road | One Side | 138.47 | Height | 7 | ----- | 0 |
T18-0 | 2 | Erosion | | Left Bank | 38.82 | Height | 3 | ----- | 0 |
T18-0 | 2 | Erosion | | Left Bank | 50 | Height | 4 | ----- | 0 |
T18-0 | 2 | Erosion | | Left Bank | 66.75 | Height | 3 | ----- | 0 |
T18-0 | 2 | Erosion | | Left Bank | 77.73 | Height | 4 | ----- | 0 |
T18-0 | 2 | Erosion | | Left Bank | 105.27 | Height | 5 | ----- | 0 |
T18-0 | 2 | Erosion | | Left Bank | 129.61 | Height | 4 | ----- | 0 |
T18-0 | 2 | Erosion | | Right Bank | 52.24 | Height | 4 | ----- | 0 |
T18-0 | 2 | Erosion | | Right Bank | 63.81 | Height | 3 | ----- | 0 |
T18-0 | 2 | Erosion | | Right Bank | 67.37 | Height | 2 | ----- | 0 |
T18-0 | 2 | Erosion | | Right Bank | 70.32 | Height | 4 | ----- | 0 |
T18-0 | 2 | Erosion | | Right Bank | 70.46 | Height | 6 | ----- | 0 |
T18-0 | 2 | Erosion | | Right Bank | 72.86 | Height | 3 | ----- | 0 |
T18-0 | 2 | Erosion | | Right Bank | 74.43 | Height | 3 | ----- | 0 |
T18-0 | 2 | Erosion | | Right Bank | 80.81 | Height | 3 | ----- | 0 |
T18-0 | 2 | Erosion | | Right Bank | 132.33 | Height | 3 | ----- | 0 |
T18-0 | 2 | Erosion | | Right Bank | 145.66 | Height | 3 | ----- | 0 |
T18-0 | 2 | Erosion | | Right Bank | 178.79 | Height | 4 | ----- | 0 |
T18-0 | 2 | Erosion | | Right Bank | 183.1 | Height | 3 | ----- | 0 |
T18-0 | 2 | Mass Failure | | Left Bank | 27.5 | Height | 10 | ----- | 0 |
T18-0 | 2 | Mass Failure | | Right Bank | 41.13 | Height | 12 | ----- | 0 |
T18-0 | 2 | Migration | Avulsion | | 0 | ----- | 0 | ----- | 0 |
T18-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T18-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T18-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T18-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T19-A | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 34.17 | ----- | 0 | ----- | 0 |
T19-A | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 40.76 | ----- | 0 | ----- | 0 |
T19-A | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 25.81 | ----- | 0 | ----- | 0 |
T19-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 36.7 | ----- | 0 | ----- | 0 |
T19-A | 2 | Bridge or Culvert | Bridge | | 0 | Length | 150 | ----- | 0 |
T19-A | 2 | Buffers Less than 25 feet | | Right Bank | 134.12 | ----- | 0 | ----- | 0 |
T19-A | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T19-A | 2 | Encroachment | Road | One Side | 670.14 | Height | 7 | ----- | 0 |
T19-A | 2 | Erosion | | Left Bank | 74.91 | Height | 4 | ----- | 0 |
T19-A | 2 | Erosion | | Left Bank | 152.76 | Height | 3 | ----- | 0 |
T19-A | 2 | Erosion | | Left Bank | 215.81 | Height | 4 | ----- | 0 |
T19-A | 2 | Erosion | | Right Bank | 34.47 | Height | 2 | ----- | 0 |
T19-A | 2 | Erosion | | Right Bank | 45.79 | Height | 3 | ----- | 0 |
T19-A | 2 | Erosion | | Right Bank | 55 | Height | 4 | ----- | 0 |
T19-A | 2 | Erosion | | Right Bank | 85.62 | Height | 4 | ----- | 0 |
T19-A | 2 | Erosion | | Right Bank | 96.24 | Height | 3 | ----- | 0 |
T19-A | 2 | Erosion | | Right Bank | 144.42 | Height | 3 | ----- | 0 |
T19-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T19-B | 2 | Beaver Dam | | | 0 | Length | 600 | ----- | 0 |
T19-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T19-B | 2 | Erosion | | Left Bank | 90.57 | Height | 3 | ----- | 0 |
T19-B | 2 | Erosion | | Left Bank | 100.4 | Height | 2 | ----- | 0 |
T19-B | 2 | Erosion | | Right Bank | 101.57 | Height | 3 | ----- | 0 |
T19-B | 2 | Migration | Avulsion | | 0 | ----- | 0 | ----- | 0 |
T19-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T19-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |