Skip Navigation LinksHome > Projects List > Phase 1 >

West River

Data stored from FIT file

Return to File List

Version: 4.53

ReachPhaseImpactSub ImpactLocationLength (ft.)Name 1Value 1Name 2Value 2
T11.08-B2Bank Armoring or RevetmentRip-RapLeft Bank41.49764Length41 0
T11.08-B2Bank Armoring or RevetmentRip-RapRight Bank30.05312Length30 0
T11.08-B2Bridge or CulvertBridge 0Length60 0
T11.08-B2EncroachmentBermOne Side71.27625Height3Length71
T11.08-B2EncroachmentBermOne Side184.4628Height3Length184
T11.08-B2EncroachmentImproved PathOne Side1196.665Height4Length1197
T11.08-B2Erosion Left Bank48.7464Height2Length49
T11.08-B2Erosion Right Bank45.89005Height8-----0
T11.08-B2Erosion Right Bank91.05194Height4Length813
T11.08-B2Erosion Right Bank284.067Height3Length284
T11.08-B2MigrationFlood Chute 0 0 0
T11.08-B2Stormwater InputRoad Ditch 0 0 0
T11.08-B2Stormwater InputRoad Ditch 0 0 0
T11.08-B2Stormwater InputRoad Ditch 0 0 0
T11.08-B2Stormwater InputRoad Ditch 0 0 0