Agency of Natural Resources
Vermont.gov
Vermont.gov
home
projects
datasets
staff
LogOut
Projects List
Phase 1
Background
Themes
SGAT Upload
Trib Names
Exclude Reaches
Data Entry
FIT upload
Reports
Data Export
Phase 2
Exports
Home
>
Projects List
>
Phase 1
>
User Name:
*
Password:
*
Mill River
Data stored from FIT file
Return to File List
Version: 4.53
Reach
Phase
Impact
Sub Impact
Location
Length (ft.)
Name 1
Value 1
Name 2
Value 2
M2T2.2S1.04-0
2
Bridge or Culvert
34.68
Length
0
-----
0
M2T2.2S1.04-0
2
Bridge or Culvert
45.69
Length
0
-----
0
M2T2.2S1.04-0
2
Bridge or Culvert
91.86
Length
0
-----
0
M2T2.2S1.04-0
2
Bridge or Culvert
97.61
Length
0
-----
0
M2T2.2S1.04-0
2
Debris Jam
0
-----
0
-----
0
M2T2.2S1.04-0
2
Debris Jam
0
-----
0
-----
0
M2T2.2S1.04-0
2
Development
Both Sides
96.85
-----
0
-----
0
M2T2.2S1.04-0
2
Development
One Side
116.27
-----
0
-----
0
M2T2.2S1.04-0
2
Development
One Side
117.32
-----
0
-----
0
M2T2.2S1.04-0
2
Development
One Side
124.29
-----
0
-----
0
M2T2.2S1.04-0
2
Development
One Side
171.87
-----
0
-----
0
M2T2.2S1.04-0
2
Development
One Side
236.33
-----
0
-----
0
M2T2.2S1.04-0
2
Encroachment
Road
One Side
211.61
-----
0
-----
0
M2T2.2S1.04-0
2
Erosion
Left Bank
13.25
Height
4
-----
0
M2T2.2S1.04-0
2
Erosion
Left Bank
22.68
Height
4
-----
0
M2T2.2S1.04-0
2
Erosion
Left Bank
26.14
Height
1
-----
0
M2T2.2S1.04-0
2
Erosion
Left Bank
45.29
Height
3
-----
0
M2T2.2S1.04-0
2
Erosion
Left Bank
53.91
Height
3
-----
0
M2T2.2S1.04-0
2
Erosion
Right Bank
16.43
Height
2
-----
0
M2T2.2S1.04-0
2
Erosion
Right Bank
16.89
Height
1
-----
0
M2T2.2S1.04-0
2
Erosion
Right Bank
37.07
Height
3
-----
0
M2T2.2S1.04-0
2
Erosion
Right Bank
41.19
Height
3
-----
0
M2T2.2S1.04-0
2
Erosion
Right Bank
42.03
Height
4
-----
0
M2T2.2S1.04-0
2
Erosion
Right Bank
64.81
Height
4
-----
0
M2T2.2S1.04-0
2
Grade Control
Ledge
Downstream
0
Height
5
HtAbvWater
4
M2T2.2S1.04-0
2
Grade Control
Ledge
Downstream
0
Height
4
HtAbvWater
3
M2T2.2S1.04-0
2
Grade Control
Ledge
Upstream
0
Height
2
HtAbvWater
2
M2T2.2S1.04-0
2
Grade Control
Ledge
Upstream
0
Height
1
HtAbvWater
1
M2T2.2S1.04-0
2
Mass Failure
0
Height
7
-----
0
M2T2.2S1.04-0
2
Mass Failure
0
Height
2
-----
0
M2T2.2S1.04-0
2
Mass Failure
0
Height
4
-----
0
M2T2.2S1.04-0
2
Migration
Avulsion
0
-----
0
-----
0
M2T2.2S1.04-0
2
Steep Riffle or Head Cut
Head Cut
0
-----
0
-----
0
M2T2.2S1.04-0
2
Steep Riffle or Head Cut
Head Cut
0
-----
0
-----
0
M2T2.2S1.04-0
2
Steep Riffle or Head Cut
Head Cut
0
-----
0
-----
0
M2T2.2S1.04-0
2
Steep Riffle or Head Cut
Head Cut
0
-----
0
-----
0
M2T2.2S1.04-0
2
Steep Riffle or Head Cut
Head Cut
0
-----
0
-----
0
M2T2.2S1.04-0
2
Stormwater Input
0
-----
0
-----
0
M2T2.2S1.04-0
2
Stormwater Input
0
-----
0
-----
0
M2T2.2S1.04-0
2
Straightening
Straightening
1761.04
-----
0
-----
0
M2T2.2S1.04-0
2
Stream Crossing
Animal Crossing
0
-----
0
-----
0
Vermont Department of Environmental Conservation
•
Watershed Management Division
Main Building - 2nd Floor
•
One National Life Drive
•
Montpelier, VT 05620-3522
SGA Map Site
|
VT Online Bridge & Culvert Tool
|
Contact & Help
|
Policies
|
Accessibility
|
A Vermont Government Website Copyright 2008 State of Vermont