Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Upper Missisquoi

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 121    Reach ID: R47    Stream Name: Missisquoi River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 5788.9086914  
  Height 2.929  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact High  
7.2 Ice/Debris Jam Potential None Field obs. and detailed notes along entire reach
  Impact Not Significant  
7.3 Comments Step 6.5 and 6.6- only 2 good meanders were observed and measured. – There is an issue with the way bridges and culverts get indexed in v4.53. When the indexed line crosses a reach break it gets counted in both reaches (this is why we changed this to a point theme in v4.56). So there is one additional bridge in this reach. There are no issues with the number of bridges in P2. Reach segmented: Segment A-1921ft/C3-riffle pool/fair condition Segment B-6225ft/C3-riffle pool/fair condition