Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 74    Reach ID: T5.03    Stream Name: Oswegatchie Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 0.0375293  
  Height 1.667  
  (old) Bank Erosion Low  
  (old) Bank Height Low  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential Project Default
  Impact Not Significant  
7.3 Comments VT DEC, Sacha, 2/2018: Updated step 2.8 channel width to 17' based on phase 2 cross sections. The hydraulic geometry curve predicts channel width of 24.4' but a narrower reference width is not surprising given the E stream type. Segments B &E had channel widths of 17' at the ph.2 cross section & were reported in ph. 2 as in good/reference condition. Channel width measurement of 14' on segment E. Segments A and C were not assessed in ph.2 but also appear to be E streams.