Record: 65    Reach ID: T4.01    Stream Name: Cold Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 1688.1500244  
  Height 5.421  
  (old) Bank Erosion Not Significant  
  (old) Bank Height Medium  
  Impact High  
7.2 Ice/Debris Jam Potential Bridge Field obs. along entire reach
  Impact High  
7.3 Comments straightened stream, eroding banks occurring because stream is wanting to become sinuous - homeowner is losing bank and adjacent fence posts are exposed. Corn is planted right next to stream. Many miscellaneous boulders piled along banks. 3/15/07 - 0.85" of rain, plus melting snow and moving ice have caused an ice jam at the VT Rte 105 bridge. Brook is flooding adjacent fields and is flooding over highway. VTtrans has closed one lane.