Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 15    Reach ID: M15S2.01    Stream Name: Trib 2 to Reach 15 of Clyde River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 1056.3100586  
  Height 2.130  
  (old) Bank Erosion Low  
  (old) Bank Height Low  
  Impact High  
7.2 Ice/Debris Jam Potential Bridge Field obs. along entire reach
  Impact Low  
7.3 Comments First half of the reach runs through a hay field with no buffer on either bank. Landowner has recently armored the banks with bed material. Second half of reach disintegrates into multiple channels in a cedar forest.