Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 12    Reach ID: M13S4.03    Stream Name: Trib 4 to Reach 13 of Clyde River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 0.0000000  
  Height 0.000  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential Bridge Project Default
  Impact Low  
7.3 Comments bridge at Hudson Road is falling apart, undersized (12' wide), and really misaligned. Stream bed has been dredged and bed material has been piled up along the banks.