Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 57    Reach ID: T1.12    Stream Name: Outflow from Echo and Seymour Lakes

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 3583.6437988  
  Height 1.877  
  (old) Bank Erosion High  
  (old) Bank Height Low  
  Impact High  
7.2 Ice/Debris Jam Potential Not Evaluated Not Evaluated
  Impact No Data  
7.3 Comments Runs through heavily grazed pasture. Cows have access to stream, extensive erosion along most of reach. Erosion is actually on both sides of stream.