Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 79    Reach ID: T6.03    Stream Name: Pherrins River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 241.6200104  
  Height 3.000  
  (old) Bank Erosion Not Significant  
  (old) Bank Height Low  
  Impact Low  
7.2 Ice/Debris Jam Potential Project Default
  Impact Not Significant  
7.3 Comments 2018--S.Pealer, VTDEC, updated step 2.8 channel width based on phase 2 cross section, which found reach to be in good condition with E channel dimensions