Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 77    Reach ID: T6.01    Stream Name: Pherrins River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 195.5299988  
  Height 2.554  
  (old) Bank Erosion Not Significant  
  (old) Bank Height Low  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential Project Default
  Impact Not Significant  
7.3 Comments DEC, 1/2018: Step 2.8 was updated in 2008 during phase 2 QA to 23', based on field measure with tape at one segment A cross section. Regional Hydraulic Geometry Curve calculation for channel width is 49'. Field checks with rangefinder in 2017 by S.Pealer had measures of ~33' on the lower part of segment A and 45-48' on segment B. Segment A is E type with some straightening, so reference channel width for that segment is likely nearer to 33'. Segment B reference channel width closer to regional curve.