Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 1    Reach ID: M01    Stream Name: Clyde River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 396.4100037  
  Height 4.000  
  (old) Bank Erosion Low  
  (old) Bank Height Low  
  Impact Low  
7.2 Ice/Debris Jam Potential None Project Default
  Impact Not Significant  
7.3 Comments surveyed at ballfield, lake is close by downstream. straightened. <25 dominant buffer width length is no longer correct after Phase 2 field survey observations, but this cannot be altered in Phase 1 DMS because the data was entered in a previous DMS version. See Phase 2 DMS for correct <25 buffer length.