Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Lemon Fair

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 12    Reach ID: M12    Stream Name: Lemon Fair

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length  
  Height  
  (old) Bank Erosion High  
  (old) Bank Height High  
  Impact High  
7.2 Ice/Debris Jam Potential Bridge Project Default
  Impact Low  
7.3 Comments Keith Hartline mentioned that there were high banks and erosion in this reach that may or may not have been stabilized.