Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

West Branch Little River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 64    Reach ID: M09    Stream Name: West Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 0.0000000  
  Height 0.000  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential Project Default
  Impact Not Significant  
7.3 Comments Used SGAT-generated channel width (22.9 feet) to calculate Phase 1 valley confinement type. However, phase 2 channel width was consistently much greater than SGAT generated channel width for 3 assessed segments (32, 37, and 29 feet). Difference may be due in part to natural reasons such as greater precipitation and slope in West Branch watershed; reference channel width and confinement ratio are uncertain.