Record: 56    Reach ID: M08.S1.01    Stream Name: Big Spruce Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 0.0000000  
  Height 0.000  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Low  
7.2 Ice/Debris Jam Potential Project Default
  Impact Not Significant  
7.3 Comments Phase 1 confinement is estimated. No Phase 1 valley width has been entered. The channel was historically altered and appears to have come into the West Branch upstream of the current confluence. Phase 1 valley walls could not be drawn for segment M08S1.01-A because they do not exist naturally. Reference channel width is uncertain. SGAT generated width (12.4ft) is much less than phase 2 channel widths for 2 assessed segments (29ft, 22ft). Throughout upper West Branch, phase 2 channel width was consistently much greater than SGAT generated channel width, possibly due in part to natural reasons such as greater precipitation and slope in West Branch watershed.