Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

West Branch Little River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 55    Reach ID: M08    Stream Name: West Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 0.0000000  
  Height 0.000  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Low  
7.2 Ice/Debris Jam Potential Project Default
  Impact Not Significant  
7.3 Comments Used SGAT-generated channel width to calculate Phase 1 valley confinement type. However, phase 2 channel width was consistently much greater than SGAT generated channel width for 3 assessed segments (42ft, 38ft, 44ft). Difference may be due to natural reasons such as greater precipitation in West Branch watershed, but bankfull was hard to identify, so reference channel width is uncertain. Phase 1 valley may actually be more confined.