Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Leach Stream

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 6    Reach ID: M08    Stream Name:

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 0.0000000  
  Height 0.000  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential Debris Project Default
  Impact Low  
7.3 Comments Downstream debris jam potential. Actual level of straightening needs to be confirmed in the field, could be the result of a narrowly confined valley, rather than the proximity to Rte 114. Caution: Data Provisional. Watershed area is underestimated in SGAT. Streamstats calc for watershed area is 10 sq. miles. Regional curve calc. of channel width = 36