Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Tyler Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 66    Reach ID: T2S1.04    Stream Name: Unnamed 1 to T2

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Field obs. along entire reach
  Erosion Length 1243.1900635  
  Height 1.506  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Low  
7.2 Ice/Debris Jam Potential Debris Field obs. along entire reach
  Impact High  
7.3 Comments Reach contains 2 sub-reaches (segs A and C) Seg. A ~ 581 ft = C3 riffle pool, ~1.9% slope Seg. B ~2463 ft = Ba step-pool, ~6% slope Seg. C ~6,972 ft = Cb4 riffle-pool, ~ 3.5% slope Seg. D ~4968 ft = alternating short sections of B- and C-type channels with intermittent cascades_waterfalls interspersed throughout as well; ~ 7.5% slope overall, typed as Ba in Phase 2 Valley width is variable over this long reach; width (166 ft) used for confinement calculation is the same as original Phase 1 estimate and is relatively accurate for overall average throughout reach Small withdrawal in Step 5 is a 1.5 in pipe drawing from the stream for washing equipment at the sugarhouse at the end of Peaked Hill Rd Long reach; overall impact for depositional features is low but can be high in localized areas (particularly seg C); same for debris jams (higher impacts in segs C and D)