Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Tyler Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 34    Reach ID: T1.15    Stream Name: The Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Field obs. along entire reach
  Erosion Length 0.0000000  
  Height 0.000  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential Debris Field obs. along entire reach
  Impact High  
7.3 Comments Reach consists of 3 distinct sub-reaches – Seg. A ~890 ft = E4 riffle-pool (0.7 pct slope), Seg. B ~1,383 = C4 riffle-pool (2 pct slope); and Seg. C ~2,346 ft = A3 cascade (4.9 pct slope). Reference stream type based on dominant condition (seg C). Valley width used was measured in segment C; reference channel width from hydrography curve used to calculate confinement ratio, as phase 2 field-measured channel width (18 ft) appeared to be indicative of adjustments.