Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Black Creek Head

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 19    Reach ID: M6T6.04    Stream Name: Elm Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length  
  Height  
  (old) Bank Erosion No Data  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential Multiple Project Default
  Impact No Data  
7.3 Comments Bed material (7.1) from B&C assessments. Rip-rap (5.3) was not inferred along Stratton Road because soil survey coverage suggests bedrock outcropping. Grade control (3.2) inferred from soil survey mapping, but should have field-truthing.