Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

White River - Third Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 10    Reach ID: M01-S3.03    Stream Name: M01-S3 - Camp Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 1013.7505493  
  Height 4.306  
  (old) Bank Erosion Low  
  (old) Bank Height Low  
  Impact Low  
7.2 Ice/Debris Jam Potential Debris Field obs. and detailed notes along entire reach
  Impact High  
7.3 Comments Beaver dam