Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Missisquoi - Canada to Trout

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 22    Reach ID: R19    Stream Name: Missisquoi River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 4644.0400391  
  Height 4.090  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact High  
7.2 Ice/Debris Jam Potential Multiple Project Default
  Impact High  
7.3 Comments Highly adj w/ AVUL (see doc). Replacem water line Xg compl 2004 (Cahoon, 2004; ACOE, 2005); ripar buff enhance & 2004 toe stabiliz in buff gaps (Hakey, 2005); AV in 1996-97 (Hakey, 2005). Riprap RIT(5.3) is approx; NRCS actually placed on AV chann