Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

New Haven River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 1    Reach ID: M01    Stream Name: New Haven River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Field obs. and detailed notes along entire reach
  Erosion Length 0.0000000  
  Height 0.000  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential Multiple Field obs. and detailed notes along entire reach
  Impact Low  
7.3 Comments Phase 1 data updated Jan 2008 following Sept 2007 Phase 2 assessment of reach. Reach contains sections of bedrock-cascade and bedrock-step/pool, as well as bedrock gorge. An impoundment in downstream Otter Creek (Huntington Falls hydroelectric dam) within 1.3 miles downstream of New Haven River confluence may have small flow regulation impact on this reach of New Haven River. This downstream flow regulation could not be feature indexed under Step 5.1 as the dam is located on the receiving channel, not a Phase-1-delineated reach of the New Haven River. Selected "Not Applicable" under Meander geometry steps (6.5, 6.6) due to considerable vertical and lateral bedrock controls.