Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Battenkill River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 26    Reach ID: T2.03    Stream Name: Roaring Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 368.1300049  
  Height 5.720  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Low  
7.2 Ice/Debris Jam Potential Bridge Project Default
  Impact Low  
7.3 Comments Phase 1 data updated Oct 2008 (SMRC) based on Ph 2 field observations (July-Aug 2008). Meander geometry (6.5, 6.6) not applicable due to bedrock controls. East Arlington covered bridge crosses mid reach; foundations are elevated well above flood prone stage on bedrock.