Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Mettowee River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 12    Reach ID: M05T03.01    Stream Name: Flower Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Field obs. and detailed notes along entire reach
  Erosion Length 1355.0000000  
  Height 3.834  
  (old) Bank Erosion High  
  (old) Bank Height Low  
  Impact High  
7.2 Ice/Debris Jam Potential Multiple Field obs. along entire reach
  Impact High  
7.3 Comments Access behind town hall, at Rte 30 bridge and behind fire station. Info updated after phase 2 field assessment.