Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Williams River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 64    Reach ID: T5.S1.07    Stream Name: South Branch Williams River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 1359.8940430  
  Height 4.698  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Low  
7.2 Ice/Debris Jam Potential Debris Field obs. and detailed notes along entire reach
  Impact High  
7.3 Comments This reach sustained major damage during T.S. Irene. The reach is overwidened by >50% and the stream appears to have jumped its banks at the Popple Dungeon Road crossing and flooded down the road for a long distance. During the phase 2 assessment twelve debris jams and one undersized culvert were observed, resulting in high ice/debris jam potential.