Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Williams River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 53    Reach ID: T5.07    Stream Name: Middle Branch Williams River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 1170.3227539  
  Height 6.742  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact High  
7.2 Ice/Debris Jam Potential Multiple Field obs. and detailed notes along entire reach
  Impact Low  
7.3 Comments -Despite the broad valley width the channel geometry fit B-type characteristics much more so than C-type during the windshield survey. There were five debris jams and one constriction less than curve width resulting in a low impact for ice/debris jam potential.