Williams River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 51    Reach ID: T5.05    Stream Name: Middle Branch Williams River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 1115.6765137  
  Height 7.335  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Low  
7.2 Ice/Debris Jam Potential Multiple Field obs. and detailed notes along entire reach
  Impact High  
7.3 Comments Spoke with a property owner during windshield surveys at the Andover confluence. He said that a massive debris jam formed at the confluence during T.S. Irene and the two houses located on the right floodplain were flooded 3-4ft deep. Eight debris jams and one constriction less than curve width were observed in the reach, which caused the ice/debris jam impact to be high.