Record: 75    Reach ID: T5.S3.02    Stream Name: Andover Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 1649.0806885  
  Height 7.100  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact High  
7.2 Ice/Debris Jam Potential Multiple Field obs. and detailed notes along entire reach
  Impact High  
7.3 Comments -During the windshield survey this reach was determined to be a b-type, despite the broad valley confinement, due to the channel geometry and entrenchment. During the phase 2 assessment thirteen debris jams and three constrictions under curve width were identified, resulting in a high risk of ice/debris jam potential.