Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Williams River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 49    Reach ID: T5.03    Stream Name: Middle Branch Williams River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 2912.8850098  
  Height 7.413  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact High  
7.2 Ice/Debris Jam Potential None Field obs. and detailed notes along entire reach
  Impact Low  
7.3 Comments Major post-Irene dredging throughout this reach was identified by Marie Caduto. During assessment there was one bridge narrower than curve width and no debris jams observed, resulting in a low impact potential for ice/debris jams.