Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Williams River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 19    Reach ID: M19    Stream Name: Williams River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 20.8701916  
  Height 6.000  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential Multiple Field obs. and detailed notes along entire reach
  Impact Low  
7.3 Comments Bedrock outcrops along right bank in many areas along reach. We observed numerous natural grade controls throughout reach. While assessing this reach we observed a total of three debris jams and three bridge constrictions, two of which were less than curve width, resulting in the low potential ice/debris jam potential.