Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Williams River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 27    Reach ID: T1.01    Stream Name: First Unnamed Tributary

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 0.0000000  
  Height 0.000  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential None Project Default
  Impact Not Significant  
7.3 Comments VHD is incorrect upstream of rt 103. T1.01 crossing 103 approximately 700ft W of the VHD line and then crosses Narrows road approximately 850ft upstream of the T1.02 reach break. DMS entries are based on field observations of the correct reach. Channel slope was observed at approximately 4% through a semi-confined valley with very steep side slopes.