Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Lower Passumpsic

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 28    Reach ID: T3.06    Stream Name: T3 - Sleepers River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 32.6199989  
  Height 6.510  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential Bridge Field obs. along entire reach
  Impact Low  
7.3 Comments Bridge is at a moderate angle to stream and is low and undersized. Modified reference stream type of "F" selected based on permanent road encroachment along the left bank and a tight forested valley wall on the right bank. The stream has very limited opportunity to change bed profile or planform due to these factors.