Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Lower Passumpsic

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 22    Reach ID: T2.09    Stream Name: Water Andric

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 781.2000122  
  Height 4.674  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Low  
7.2 Ice/Debris Jam Potential Multiple Field obs. along entire reach
  Impact High  
7.3 Comments Areas of significant bank erosion and channel enlargement from recent flooding. Numerous debris jams were observed throughout the reach during Ph2 assessment. Most of the jams were associated with bends in the channel, however a huge log jam was observed above the undersized culvert at the top of the reach.