Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Lower Passumpsic

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 21    Reach ID: T2.08    Stream Name: Water Andric

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 73.8099976  
  Height 5.157  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential Debris Field obs. along entire reach
  Impact High  
7.3 Comments T2.08 was segmented for Phase 2, segment A is 1,922 ft long and is C4 riffle pool by reference. Sub-reach segment B is 1,896 feet long and is B3 riffle-pool by reference but was assessed as an F3 departure. Numerous debris jams were observed throughout the reach during Ph2 assessment. Major jams were associated with mass failures, bends in channel, and tight valley walls.