Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Lower Passumpsic

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 15    Reach ID: T2.02    Stream Name: Water Andric

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 0.0000000  
  Height 0.000  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential Project Default
  Impact Not Significant  
7.3 Comments VW width was increased from the SGAT derived 158'' to approximate reference conditions prior to significant filling of the left floodplain to build the loading area for the log yard.