Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

East Creek

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 36    Reach ID: T9.03    Stream Name: Cranberry Swamp Trib

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 0.0000000  
  Height 0.000  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential None Project Default
  Impact Not Significant  
7.3 Comments Sections of this reach are characterized as wetland, deviating from the step/pool bedform. The upstream end of this reach actually drains out of Perch Pond which is not included in the HUC12 East Creek watershed. It appears the Perch Pond may drain in two directions, the T9 outlet may only flow at high-water times. Extending the watershed to include half of perch pond would only add about 50 acres or .08 sq miles to the watershed area.