Record: 30    Reach ID: M19S1.01    Stream Name: Trib to Browns

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 181.5499878  
  Height 3.000  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential Debris Project Default
  Impact Low  
7.3 Comments Reach segmented 3 times because of impounding, buffer condition, and habitat. Segment M19.S1.01-A was not assessed because it was impounded by 8 beaver dams. Bank and buffer data has been entered for M19.S1.01-A and all other data that could be obtained from aerial photos and topographic maps. M19.S1.01-B was the nicely buffered area between the end of the area affected by beaver activity and just upstream of the Mountain road crossing. M19.S1.01-B = Cb4, Riffle-Pool. M19.S1.01-C is the segment with low buffer width upstream of the Mountain Road crossing. M19.S1.01-C = Eb3, Plane bed. Reach M19.S1.01-C had two withdrawal points, these features were pipes diverted water from the channel into a pond at a lower elevation. The ponds had overflow pipes that re-entered the channel downstream.