Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Browns River Tribs

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 13    Reach ID: M09S1.02    Stream Name: Trib to Browns

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 0.0000000  
  Height 0.000  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential Debris Project Default
  Impact High  
7.3 Comments Photo2- upstream. Beaver impoundment w/ beaver baffle at road crossing. Significant wetlands on both sides of road. The migration near the downstream reach point is from a large oxbow evident in 1962 aerial photos.