Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Stevens Branch

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 137    Reach ID: T7.01    Stream Name: Trib 7 to Stevens Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 192.9900055  
  Height 3.000  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential Bend Project Default
  Impact Low  
7.3 Comments Valley width calculated from field verified valley wall (multiple measurements since valley wall is variable). Changed stream type, substrate, and bedform, to better represent reality as found in the Phase 2 process.