Record: 86    Reach ID: T3.05    Stream Name: Jail Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 0.0000000  
  Height 0.000  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential None Project Default
  Impact Not Significant  
7.3 Comments S. Pealer, 8/5/08: We are not confident in the reference stream type or confinement at this point due to the manipulation associated with the East Barre Dam. The valley width was not measured in windshield surveys, so the valley is presumed to be confined based on slope.