Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

West Branch Passumpsic

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 22    Reach ID: T3.S3.01    Stream Name: Sutton River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 126.4715042  
  Height 2.772  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential Multiple Field obs. along entire reach
  Impact High  
7.3 Comments Reach has been segmented for Phase 2 assessment. T3.S3.01-A - 1,320 feet, B4c, riffle-pool. STD from a C to a B. T3.S3.01-B - 540 feet, no landowner permission. T3.S3.01-C - 1,756 feet, C3, riffle-pool.