Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Moose River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 9    Reach ID: M09    Stream Name: Moose River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 805.4699707  
  Height 4.840  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Low  
7.2 Ice/Debris Jam Potential Multiple Project Default
  Impact Low  
7.3 Comments 2008 Comments: A very braided section of the River. Many islands. 2016 Comments: S.Pealer, VT DEC, updated step 2 Valley width and confinement based on Statewide Valley Wall analysis from 2014. Appears the Valley width of 304' previously entered was at the phase 2 xsection location and not representative of this long reach. Also, changed phase 1 stream type from B4 to C4 based on high confinement ratio, slope, and sinuosity. Some segments may be E by reference.