Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Moose River

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 7    Reach ID: M07    Stream Name: Moose River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 0.0000000  
  Height 0.000  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential None Project Default
  Impact Not Significant  
7.3 Comments 2009 Comments: Very short reach. Faster water; cobble. No erosion. 2016 Comments: Changed step 2.11 to E4 based on field observation at access point along road. Orthos suggest a former meander pattern with a sinuosity of ~1.6, so this reach is likely historically straightened. In 2009, the channel width had been changed from curve width of 105.8' to 93' based on field measurement but ortho measurements suggest the channel width could be narrower on average.