Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Winooski Mid, Alder to Montp

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 28    Reach ID: R10.S2.01    Stream Name: Preston Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Field obs. at access point along reach
  Erosion Length  
  Height  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential None Field obs. at access point along reach
  Impact Not Significant  
7.3 Comments Straightened and bermed in 1927. A small amount of erosion on medium high banks was observed in the field notes, however not mapped in the FIT. A field impact rating of low was assigned for step 7.2 based on field observations of the reach.