Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

White River - Mainstem

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 140    Reach ID: R6-S3.04    Stream Name: Quation Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

    Data values Metadata
7.1 Bank Erosion/Height   Project Default
  Erosion Length 245.1699982  
  Height 2.796  
  (old) Bank Erosion None  
  (old) Bank Height No Data  
  Impact Not Significant  
7.2 Ice/Debris Jam Potential Multiple Project Default
  Impact Low  
7.3 Comments Valley is confined in lower reach with a confinement ratio of 2.5, but upper reach is very broad. Extent of confined setting seemed to be dominant and when averaged the Ph1 reference valley type is broad. Average valley width for Phase 1 calculated to be 70 ft. See Ph 2 valley widths for more information. Reach Segmented because of channel dimensions and valley width: R6.S3.04-A = 3,837 ft, Ba4, Step-Pool; R6.S3.04-B = 3,078 ft, E4, Riffle-Pool.