Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Upper Missisquoi

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 97    Reach ID: R43    Stream Name: Missisquoi River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 2,545.0
  Data values Metadata
6.1 Encroachments None  Project Default 
  One Side Both Sides  
  Road 0 ft. 0 ft.  
  Rail Road 0 ft. 0 ft.  
  Berm 0 ft. 0 ft.  
  Improved Path 0 ft. 0 ft.  
  (Old Data) 0 ft. 0 ft.  
  Impact Not Significant  
6.2 River Corridor Development None    Project Default
  Length / Percent 0 ft. 0 ft. 0.0 %
  Impact Not Significant  
6.3 Depositional Features Multiple   Project Default
  Impact High  
6.4 Meander Migration Flood Chute   Project Default
  Impact Not Significant  
6.5 Meander Width 61 ft. Project Default
  Meander Width Ratio 1.0  
  Impact High  
6.6 Wavelength 61 ft. Not Evaluated
  Wavelength Ratio 1.0  
  Impact High