Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 57    Reach ID: T1.12    Stream Name: Outflow from Echo and Seymour Lakes

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 3,457.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 711 ft. ft.  
  Rail Road ft. ft.  
  Berm ft. ft.  
  Improved Path 257 ft. ft.  
  (Old Data) 0 ft. 0 ft.  
  Impact High  
6.2 River Corridor Development     Project Default
  Length / Percent 473 ft. 0 ft. 13.7 %
  Impact Low  
6.3 Depositional Features No Data   Project Default
  Impact Not Significant  
6.4 Meander Migration Not Evaluated   Project Default
  Impact No Data  
6.5 Meander Width 42 ft. Project Default
  Meander Width Ratio 2.1  
  Impact High  
6.6 Wavelength 91 ft. Project Default
  Wavelength Ratio 4.6  
  Impact High