Skip Navigation LinksHome > Projects List > Phase 1 > Data Entry

Clyde

Return to Reach List   Step1Step2Step3Step4Step5Step6Step7Map


Record: 48    Reach ID: T1.01    Stream Name: Outflow from Echo and Seymour Lakes

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Length: 760.0
  Data values Metadata
6.1 Encroachments   Project Default 
  One Side Both Sides  
  Road 84 ft. ft.  
  Rail Road ft. ft.  
  Berm ft. ft.  
  Improved Path ft. ft.  
  (Old Data) 84 ft. 0 ft.  
  Impact Low  
6.2 River Corridor Development     Project Default
  Length / Percent 150 ft. 0 ft. 19.8 %
  Impact Low  
6.3 Depositional Features   Project Default
  Impact Not Significant  
6.4 Meander Migration   Project Default
  Impact  
6.5 Meander Width ft. Project Default
  Meander Width Ratio 0.0  
  Impact No Data  
6.6 Wavelength ft. Project Default
  Wavelength Ratio 0.0  
  Impact No Data